S.No |
Project Title |
Main Contractor |
Project Completion Date |
Project Status |
Remarks |
1 |
C886 LTA MRT PROJECT |
KOH BROTHERS/ PUMYANG E&C (SUB) |
9-Jul-18 |
Completed
|
Land Survey for DIAPHARAM WALL |
2 |
PUB-2200/1600 DIA PIPE LINE AT JALAN KAMPONG CHANTAK TO PIE/RIFLE ROAD SHAFT3 TO SHAFT2 |
LEY CHOON GROUP HOLDING |
27-Jun-18 |
Completed
|
590M LENGTH, 1600MM DIA Pipe Jacking Tunnel VMT Survey |
3 |
PUB-2200/1600 DIA PIPE LINE AT JALAN KAMPONG CHANTAK TO PIE/RIFLE ROAD SHAFT3 TO SHAFT4 |
BOTHAR BORING & TUNNELLING |
27-Jul-19 |
Completed
|
468M LENGTH, 1600MM DIA Pipe Jacking Tunnel VMT Survey |
4 |
LTA CONTRACT 821A-CONSTRUCTION OF KIM CHUAN DEPOT EXT-CIRCLE LINE6 |
SAMBO |
1-Nov-19 |
Completed
|
Land Survey for DIAPHARAM WALL |
5 |
MICRON @ 990 Bendemeer road |
UNI ASSOSIATED CONSULTANT |
1-Oct-19 |
Completed
|
Topographical Survey for A&A work |
6 |
JTC- Logistic Hup @ Gul Circle |
Yongnam Engineering & Construction ( PTE) Ltd |
2-Jan-20 |
Completed
|
JTC Logistics hub Steel structure surveying work |
7 |
MICRON @ 990 Bendemeer road |
DYNEGY SOLUTIONS PTE LTD |
29-Jul-20 |
Completed
|
Airliquide 150KL Tank installation Verticality survey |
8 |
SILTRONIC @ Tampines (Tank height: 12m. Tank diameter: 3m |
DYNEGY SOLUTIONS PTE LTD |
24-Feb-21 |
Completed
|
Airliquide 12M Tank installation Verticality survey |
9 |
SUPPLY, LAYING AND INSTALLATION OF 1200MM DIAMETER POTABLE WATER PIPELINE FROM MARINA EAST DESALINATION PLANT TO JOO SENG ROAD (PUB) |
SAM LAIN EQUIPMENT SERVICES PTE LTD |
14-Aug-21 |
Completed
|
1200MM Pipe Jacking Tunnel Survey |
10 |
PROPOSED SEWERS IN PUNGGOL ROAD AND SENGKANG EAST AREAS-Contract 2 (PUB) |
Building Construction Co. (Private) Limited |
6-Aug-21 |
Completed
|
Pipe Jacking Tunnel Surveying |
11 |
PROPOSED SEWERS IN PUNGGOL NORTH AREA - CONTRACT 2 (PUB) |
Building Construction Co. (Private) Limited |
13-Sep-21 |
Completed
|
Pipe Jacking Tunnel Surveying |
12 |
NSC102 (LTA) : DESIGN AND CONSTRUCTION OF NORTH-SOUTH CORRIDOR (TUNNEL) BETWEEN VICTORIA STREET AND KAMPONG JAVA ROAD |
Building Construction Co. (Private) Limited |
24-Nov-21 |
Completed
|
Pipe Jacking Tunnel Surveying |
13 |
CONTRACT J1019 : SEWER DIVERSION AT BOON LAY JURONG WEST |
Building Construction Co. (Private) Limited |
28-Jan-22 |
Completed
|
Pipe Jacking Tunnel Surveying |
14 |
CONTRACT 190 DESIGN AND CONSTRUCTION OF INTEGRATED TRAIN TEST CENTRE-TUAS (MRT DEPOT) |
GS ENGINEERING & CONSTRUCTION |
26-May-22 |
Completed
|
BORED PILING ( MRT DEPOT) |
15 |
CONTRACT CR103 DESIGN AND CONSTRUCTION OF AVIATION PARK STATION AND TUNNELS |
BKR INTERNATIONAL PTE LTD |
29-Aug-22 |
Completed
|
DIAPHARAM WALL |